New Paphos Expressway: Sustainability Study Delays Project
The large-scale project of a modern four-lane expressway from Tombs of the Kings in Lower Paphos to Coral Bay in Pegeia is facing unexpected delays as a sustainability study has suddenly been required, described by local stakeholders as a "shock" and death knell for the project. The belated requirement for this feasibility study jeopardizes the schedule and realization of the transport project in the Paphos region.