Trozena: Power Supply Costs 370,000 Euros - Costs Shared
The abandoned village of Trozena in Limassol is being redeveloped with planned 60 residential houses, a wine cellar, and a campsite. Power supply and water connection will cost approximately 370,000 euros, with the investor and local residents splitting the costs equally. Infrastructure development is an important step for the village's revitalization plans.